ORIGIN PRECON

Sign in to open the demo.

Two apps. One discipline. Preconstruction evolved.

Please enter a valid work email.
I have read and agree to the Terms of Use.

By continuing, you accept that this site logs your email and access time. The demo is for evaluation only.

© 2026 Origin Precon. All rights reserved.
Origin Precon Terms of Use v1.0 · May 2026
01
About
Origin Precon is a USPTO registered, independent software venture by Kevin Murdock. The demo at demo.originprecon.com and demo.originprecon.com is provided for evaluation only and is not a substitute for professional preconstruction services.
02
License
You are granted a limited, non exclusive, non transferable, revocable license to access and view the demo for personal evaluation. No production use, redistribution, or commercial deployment is permitted without written agreement from Origin Precon.
03
Prohibited Uses
You may not (a) copy or republish any part of the site or its underlying code, (b) attempt to reverse engineer, decompile, or otherwise derive source code, (c) use the demo content to train or fine tune any machine learning model, (d) misrepresent your affiliation with Origin Precon or its owner, or (e) use the demo for any unlawful purpose.
04
Intellectual Property
All visual design, code structure, content, taglines, and trade dress are property of Kevin Murdock. ORIGIN PRECON, VITALS, TOOLS, PROCURE, COMPASS, REGISTER, STAGE, INDEX, and the associated marks are trademarks of Kevin Murdock. Unauthorized reproduction, redistribution, or reverse engineering is prohibited.
05
Third Party Content
The demo may reference public commodity indices including BLS PPI, Turner BCI, Mortenson CCI, Gordian, and RLB QCR. All such references are made under fair use with attribution. No endorsement is claimed or implied by the referenced publishers.
06
No Warranty
The demo is provided as is, without any warranty of any kind, express or implied. Origin Precon makes no representations about availability, accuracy, completeness, or fitness for any particular purpose. Project data shown in the demo is illustrative and does not reflect any real client engagement.
07
Limitation of Liability
In no event shall Kevin Murdock or Origin Precon be liable for any indirect, incidental, consequential, or punitive damages arising from your use of the demo. Total aggregate liability shall not exceed the amount you paid to access the demo, which is zero.
08
Confidentiality
You agree to treat the demo design, structure, and content as confidential. Do not share screenshots, URLs, or other materials publicly without written permission from Origin Precon.
09
Termination
Access may be revoked at any time, with or without notice. Upon termination, your license to use the demo ends immediately and you must cease all use of the materials.
10
Governing Law
These Terms are governed by the laws of the State of Michigan, without regard to conflict of law principles. Any dispute shall be resolved in the state or federal courts located in Wayne County, Michigan.
11
Contact
Questions about these Terms or about Origin Precon should be directed to info@originprecon.com.
© 2026 ORIGIN PRECON™ info@originprecon.com
ORIGIN PRECON
v1.0

Vitals

Project health diagnostics.
5 ACTIVE · 12 COMPLETE · 9 CATEGORIES · DETROIT, MICHIGAN PORTFOLIO HEALTH · 82%
ACTIVE SCANS·5 OF 17·LAST UPDATED 14:23 EDT
Active scans.
Resume diagnostics in progress, or open a completed report. Or start a new scan from scratch using the button below.
01
Riverside Medical Center, 6 story ambulatory tower. ANN ARBOR, MI  ·  $48.2M GMP  ·  18 MONTHS  ·  FEB 2026 → AUG 2027
› IN PROGRESS
DEEP SCAN
(?) 14 / 50 ANSWERED  ·  SAFETY · QUALITY COMPLETE  ·  LAST EDIT 2 DAYS AGO
+ ADD NOTE
02
Cedar Ridge Modular Block, 20 lot residential. DETROIT, MI  ·  $4.8M GMP  ·  14 MONTHS  ·  PURSUIT 26-0042
› 87 HEALTH
QUICK SCAN
(?) 20 / 20 COMPLETE  ·  3 ACTION ITEMS OPEN  ·  SIGNED OFF 5 DAYS AGO
+ ADD NOTE
03
Lakefront Performance Center, JV practice facility. DETROIT, MI  ·  $39M GMP  ·  24 MONTHS  ·  RFP RESPONSE
› IN PROGRESS
DEEP SCAN
(?) 8 / 50 ANSWERED  ·  SAFETY UNDERWAY  ·  STARTED YESTERDAY
+ ADD NOTE
04
Anchor Retail Refresh, flagship debranding. ANN ARBOR, MI  ·  4,500 SF  ·  8 WEEKS  ·  STORE #230
› 91 HEALTH
QUICK SCAN
(?) 20 / 20 COMPLETE  ·  1 ACTION ITEM OPEN  ·  SIGNED OFF 11 DAYS AGO
+ ADD NOTE
05
North Loop Bandshell, community pavilion. SHELBY TWP, MI  ·  22,021 SF  ·  16 MONTHS  ·  NO BID DECISION
› ARCHIVED
QUICK SCAN
(?) 0 / 20 ANSWERED  ·  NO BID RATIONALE LOGGED  ·  CLOSED 18 DAYS AGO
+ ADD NOTE
VITALS · HOME · PAGE 1 OF 1
ALL PROJECTS·17 TOTAL·FILTERS APPLIED
Projects.
Filter and review every project you have scanned.
FILTERS
01
Riverside Medical Center, 6 story ambulatory tower. ANN ARBOR, MI  ·  $48.2M GMP  ·  18 MONTHS  ·  FEB 2026 → AUG 2027
› IN PROGRESS
DEEP SCAN
(?) 14 / 50 ANSWERED  ·  SAFETY · QUALITY COMPLETE  ·  LAST EDIT 2 DAYS AGO
+ ADD NOTE
02
Cedar Ridge Modular Block, 20 lot residential. DETROIT, MI  ·  $4.8M GMP  ·  14 MONTHS  ·  PURSUIT 26-0042
› 87 HEALTH
QUICK SCAN
(?) 20 / 20 COMPLETE  ·  3 ACTION ITEMS OPEN  ·  SIGNED OFF 5 DAYS AGO
+ ADD NOTE
03
Lakefront Performance Center, JV practice facility. DETROIT, MI  ·  $39M GMP  ·  24 MONTHS  ·  RFP RESPONSE
› IN PROGRESS
DEEP SCAN
(?) 8 / 50 ANSWERED  ·  SAFETY UNDERWAY  ·  STARTED YESTERDAY
+ ADD NOTE
04
Anchor Retail Refresh, flagship debranding. ANN ARBOR, MI  ·  4,500 SF  ·  8 WEEKS  ·  STORE #230
› 91 HEALTH
QUICK SCAN
(?) 20 / 20 COMPLETE  ·  1 ACTION ITEM OPEN  ·  SIGNED OFF 11 DAYS AGO
+ ADD NOTE
05
North Loop Bandshell, community pavilion. SHELBY TWP, MI  ·  22,021 SF  ·  16 MONTHS  ·  NO BID DECISION
› ARCHIVED
QUICK SCAN
(?) 0 / 20 ANSWERED  ·  NO BID RATIONALE LOGGED  ·  CLOSED 18 DAYS AGO
+ ADD NOTE
COMPLETED REPORTS·12 TOTAL·SORTED BY RECENT
Reports.
Every completed scan, scored and exportable.
SORT BY
Cedar Ridge Modular BlockDEEP SCAN · DETROIT, MI · 50 / 50 ANSWERED
› 87 HEALTH    5 DAYS AGO
Anchor Retail RefreshQUICK SCAN · ANN ARBOR, MI · 20 / 20 ANSWERED
› 91 HEALTH    11 DAYS AGO
Forbes Sports MedicineDEEP SCAN · ANN ARBOR, MI · 50 / 50 ANSWERED
› 73 HEALTH    21 DAYS AGO
Hondros College NursingQUICK SCAN · LIVONIA, MI · 20 / 20 ANSWERED
› 79 HEALTH    32 DAYS AGO
Coleman A. Young Master PlanDEEP SCAN · DETROIT, MI · 50 / 50 ANSWERED
› 64 HEALTH    47 DAYS AGO
Apple Briarwood DebrandQUICK SCAN · ANN ARBOR, MI · 20 / 20 ANSWERED
› 94 HEALTH    58 DAYS AGO
QUESTION LIBRARY·11 CATEGORIES·50 QUESTIONS·3 MODES
Library.
Every question, every category, every piece of coaching. On one page.
TRIAGE
5
Parachute drop. One critical question per high priority area. 60 second pulse check.
QUICK SCAN
22
Triage plus all weight-3 questions. The standard read for most projects, 15 minutes.
FULL
50
Deep diagnostic. Every question, every category. For first scans and post incident reviews.
SCORING METHODOLOGY
HEALTHY
100%
Full weight earned
WATCH
70%
Partial credit
ACTION
30%
Minimum signal
N/A
Excluded from denominator
Each question carries a weight from ×1 to ×3. Questions marked TRIAGE are the most diagnostic, the ones an experienced PE would ask first when dropped into an unfamiliar project. Per-category scores are computed as (earned points / possible points) × 100. The overall portfolio health is the weighted average across all answered categories. Position bands: HEALTHY ≥ 85, WATCH 65 to 84, ACTION below 65.
JUMP TO
ACCOUNT·PREFERENCES·DATA
Settings.
Manage your account, notifications, and data.
AccountEMAIL · LAST LOGIN · ROLE
PROFILE
Plan and billingEARLY ACCESS · NO COST DURING BETA · USAGE METERED FOR PRODUCT FEEDBACK ONLY
BETA
NotificationsSCAN COMPLETE · ACTION ITEM OPENED · WEEKLY DIGEST
3 ENABLED
Data exportDOWNLOAD ALL SCANS, PROJECTS, AND TOOL WORKSPACES AS JSON
EXPORT
Clear all dataREMOVE ALL PROJECTS, ANSWERS, AND TOOL WORKSPACES FROM THIS BROWSER
LOCAL ONLY
Terms and brandUSPTO REGISTERED · ORIGIN PRECON™ · v1.0
REVIEW
RIVERSIDE MEDICAL CENTER  ·  DEEP SCAN  ·  14 / 50  ·  28%
CATEGORY 1 OF 9 · 2 ANSWERED · KEY FOR CONSTRUCTION
Safety.
Plan, empower, observe.
01
Is a Plan of the Day (POD) being conducted daily by project leadership, including stretch and flex?
×3
(?) WHY THIS MATTERS · KEY FOR CONSTRUCTION
02
Does the workforce feel empowered to stop unsafe work, with data showing this happens and is supported?
×3
(?) WHY THIS MATTERS · STOP WORK AUTHORITY
03
Are subcontractor safety plans aligned with the project specific safety program and reviewed before mobilization?
×2
(?) WHY THIS MATTERS · PREMOB COMPLIANCE
SAFETY  ·  QUESTION 3 OF 6
CEDAR RIDGE MODULAR BLOCK  ·  QUICK SCAN  ·  SIGNED OFF 5 DAYS AGO
DIAGNOSIS REPORT · WEIGHTED ACROSS 9 CATEGORIES · 50 / 50 ANSWERED
Cedar Ridge, weighted health.
Twenty answers, nine categories, one score.
82
PORTFOLIO HEALTH
DEEP SCAN · 50 OF 50 · SIGNED 14:23
POSITION: WATCH
CATEGORY BREAKDOWN
Safety
94
Quality
88
Cost Control
72
Schedule
85
Legal & Risk
68
Procurement
54
Design Coord
91
Owner Alignment
79
Team Readiness
88
!
3 action items open across Procurement and Legal & Risk.PROCUREMENT 2  ·  LEGAL & RISK 1  ·  ALL ASSIGNED  ·  DUE THIS WEEK
› 3 OPEN
PROJECT  ·  0 / 6
SCAN PROGRESS 0 of 20 answered
PROJECT  ·  SIGNED OFF

Tools

Preconstruction utilities.
5 TOOLS · 14 WORKSPACES · 3 PINNED · OFFLINE READY SHARED WITH VITALS · PROJECT AWARE
FIVE TOOLS·BUILD A PRECON STACK·INDEPENDENT MODULES
Open a tool.
Each one solves a single precon problem cleanly.
01
Procure. Long lead time tracking and submittal cadence. 12 PACKAGES TRACKED  ·  2 CRITICAL  ·  LAST: CEDAR RIDGE 20 LOT
› 2 CRITICAL
LEAD TIMES
(?) ELEVATORS 28W  ·  SWITCHGEAR 23W  ·  STEEL 18W
+ PIN TO HUB
02
Compass. Go and no go scoring for pursuits. 3 PURSUITS ACTIVE  ·  LAST SCORE: 78 / GO  ·  6 CRITERIA
› 78 GO
PURSUIT FIT
(?) MARGIN 82  ·  FIT 71  ·  SCHEDULE 88  ·  RISK 62
+ PIN TO HUB
03
Register. Risk, assumption, and clarification ledger. 14 RISKS LOGGED  ·  3 HIGH  ·  9 MITIGATED  ·  17 RFIS ATTACHED
› 3 HIGH
RISK MATRIX
(?) 5 × 4 HEATMAP  ·  SCHEDULE, COST, SCOPE, QUALITY  ·  EXPORT TO PDF OR XLSX
+ PIN TO HUB
04
Stage. Site logistics, laydown, and crane planning. 2 SITE PLANS  ·  LAST: ELMWOOD AVE  ·  CRANE SWING 28M RADIUS
› ACTIVE
SITE PLAN
(?) 20 LOT MODULAR  ·  LAYDOWN AT SW CORNER  ·  IN, OUT, RECEIVING PINS PLACED
+ PIN TO HUB
05
Index. Market cost and escalation feed. REGIONAL FEED LIVE  ·  STEEL +4.2% YOY  ·  LUMBER −2.1%  ·  UPDATED HOURLY
› LIVE
ESCALATION
(?) 16 COMMODITIES TRACKED  ·  DETROIT, GREAT LAKES  ·  EXPORT TO ESTIMATE
+ PIN TO HUB
TOOLS · HUB · PAGE 1 OF 1
PROCURE  ·  CEDAR RIDGE MODULAR BLOCK  ·  12 PACKAGES  ·  2 CRITICAL
LEAD TIMES · SORTED BY WEEKS · MUST ORDER BY PROPAGATES TO SCHEDULE
Long leads.
Two critical packages threaten the schedule. Order steel by Apr 14.
PACKAGE · VENDOR · ORIGIN
LEAD TIME
ORDER BY
WEEKS
STATUS
ElevatorsKONE, single source quoted
TARIFFKOREASUBMITTAL: NOT STARTED
APR 14 2026
MUST ORDER BY
28w
CRITICAL
SwitchgearEaton, lead time confirmed
TARIFFMEXICOSUBMITTAL: IN REVIEW
MAY 02 2026
MUST ORDER BY
23w
CRITICAL
SteelMill 14 wks, fab 4 wks
TARIFFUSASUBMITTAL: APPROVED
JUN 10 2026
MUST ORDER BY
18w
WATCH
CurtainwallSpec change pending
CANADASUBMITTAL: RESUBMIT
JUN 24 2026
MUST ORDER BY
16w
WATCH
GeneratorCaterpillar 1500 kW
USASUBMITTAL: IN REVIEW
JUL 08 2026
MUST ORDER BY
14w
WATCH
GlazingInsulated units, three vendors
USASUBMITTAL: APPROVED
JUL 22 2026
MUST ORDER BY
12w
OK
RTUsTrane, in production
USASUBMITTAL: APPROVED
JUL 29 2026
MUST ORDER BY
11w
OK
Roofing membraneSika, stock available
USASUBMITTAL: APPROVED
SEP 09 2026
MUST ORDER BY
6w
OK
!
Tariff exposure flagged on switchgear and steel.SECTION 232 STEEL TARIFF · EATON ELECTRICAL TARIFF · LAST UPDATED 14:23 EDT
› TARIFF
YOUR PROCUREMENT WORKSPACE 0 packages added
COMPASS  ·  LAKEFRONT PERFORMANCE CENTER  ·  PURSUIT 26-0042
PURSUIT SCORE · 6 CRITERIA WEIGHTED · THRESHOLD 70 / GO
Go.
Score 78 over threshold 70. Pursue, with risk mitigation in mind.
WEIGHTED CRITERIA
Margin
82
Fit
71
Schedule
88
Risk
62
Owner alignment
75
Team readiness
80
78
GO
THRESHOLD 70 · PASS BY 8
CRITERIA DETAIL · WHAT FEEDS EACH SCORE
Margin
82
12% target margin validated by trade-level cost-up. Risk register adds 3% protection. Owner-approved fee tier.
TARGET 12%FLOOR 9%PE CONFIDENCE: HIGH
Fit
71
Sports / entertainment work fits portfolio capability. JV partner extends owner access. Type 4 facility experience light.
CORE TYPE: YESSCALE: WITHINPORTFOLIO REF: 3
Schedule
88
24-month duration aligns with current backlog window. Mobilization slot opens Q3. Resource curve modeled.
DURATION FITMOB Q3 2026PE BENCH: AVAILABLE
Risk
62
Single source crane permitting. Owner financing contingent on M&A close. Two-state insurance complexity.
PERMIT RISKOWNER FUNDINGINSURANCE TBD
Owner alignment
75
Repeat owner with strong history. Decision rhythm established. New OPM role introduces uncertainty.
REPEAT OWNERNEW OPMTRUST: BUILDING
Team readiness
80
PE confirmed, Super identified, MEP coordinator hiring in process. Estimator load at 80% capacity.
PE: NAMEDSUPER: NAMEDMEP COORD: PENDING
!
Risk score is the weakest factor at 62.SUGGESTED ACTION: ATTACH A REGISTER WORKSPACE TO MITIGATE BEFORE PROPOSAL SUBMITTAL
› ATTEND
YOUR PURSUIT SCORECARD Not scored yet
REGISTER  ·  CEDAR RIDGE MODULAR BLOCK  ·  14 RISKS  ·  3 HIGH
RISK MATRIX · 5 × 4 HEATMAP · PROBABILITY × IMPACT
14 risks. 3 high.
Three risks cluster in the high probability, high impact corner. Contingency band $180k to $260k.
VERY HIGH
HIGH
MEDIUM
LOW
LOW UNLIKELY POSSIBLE LIKELY CERTAIN
PROBABILITY
RISK REGISTER · ALL 14 ITEMS
ID
CATEGORY
DESCRIPTION
PROB / IMPACT
OWNER
$ BAND
STATUS
R-001
SCHEDULE
Site access delay from DTE utility coordinationMulti week impact on excavation start if cuts not coordinated
CERTAINVERY HIGH
PM
$45-80K
OPEN
R-002
SCOPE
Owner directed value engineering of modular envelope mid designPossible mid project scope shift on envelope package, redesign risk
CERTAINVERY HIGH
PX
$30-65K
OPEN
R-003
SCHEDULE
Steel package late delivery cascades into MEP rough inMill 14w + fab 4w stack against critical milestone, no float
LIKELYVERY HIGH
PROCURE
$25-55K
OPEN
R-004
COST
Switchgear tariff revision under Section 232Eaton notice of 15-20% pricing change pending Q3 tariff schedule
LIKELYHIGH
PROCURE
$25-50K
WATCHING
R-005
SCHEDULE
Crane permit (DPW) approval window may extend mobilization60 day approval window from City, multiple precedent delays
CERTAINHIGH
SUPER
$10-25K
WATCHING
R-006
SCOPE
Coordination clash between fire sprinkler and HVAC at south stairBIM detected, design hold pending engineer of record resolution
POSSIBLEHIGH
VDC
$5-15K
OPEN
R-007
COST
Weather impact on exterior phase, Nov to Feb windowHistoric delay rate 8 to 12 days per Detroit winter pour cycle
LIKELYMEDIUM
SUPER
$20-40K
OPEN
R-008
QUALITY
LEED glazing U value spec gap requires alt manufacturer reviewInitial vendor cannot meet 0.32 target, second source under review
UNLIKELYHIGH
PE
$5-12K
WATCHING
R-009
COST
Concrete pricing volatility through multi pour scheduleEight pours across 14 months exposes price index drift
POSSIBLEMEDIUM
ESTIMATOR
$8-18K
WATCHING
R-010
SCOPE
MEP rough in coordination with cabinet installerShop drawings to be reviewed against ductwork prior to release
POSSIBLELOW
PM
$0-5K
WATCHING
R-011
QUALITY
Pre mobilization safety training compressionSub onboarding window shortened to two weeks, schedule pressure
UNLIKELYLOW
SAFETY
$0-5K
MITIGATED
R-012
QUALITY
Sub base compaction below spec at SW cornerRemediated last week, geotech sign off pending
UNLIKELYLOW
QC
$3-8K
MITIGATED
R-013
COST
Owner furnished equipment delivery alignmentOFE list with two long lead items requires owner schedule confirmation
UNLIKELYMEDIUM
PE
$0-3K
MITIGATED
R-014
QUALITY
Finish material color match across two manufacturersLobby and corridor finishes specified to match across vendors
UNLIKELYMEDIUM
PE
$1-3K
MITIGATED
!
Top 3 risks open against schedule, scope, and procurement.R-001 SITE ACCESS DELAY · R-002 OWNER VE OF ENVELOPE · R-003 STEEL DELIVERY CASCADE
› 3 HIGH
YOUR RISK REGISTER 0 risks logged
STAGE  ·  CEDAR RIDGE MODULAR BLOCK  ·  ELMWOOD AVE  ·  CRANE 28M
SITE PLAN · 20 LOT MODULAR LAYOUT · LAYDOWN AT SW CORNER
Site logistics.
Laydown sized for two module deliveries per day. Crane swing covers all six lot edges.
LAYDOWN
2 mod / day
SW corner
240 sf
ELMWOOD AVENUE
LOTS LAYDOWN CRANE SWING UTILITIES PEDESTRIAN
LOGISTICS DECISIONS · 8 ITEMS
DECISION
DETAIL
QTY
LAYDOWN AREA
SW corner along Elmwood Ave. Sized for two module deliveries per day plus crane stage area.
240 SF
CRANE TYPE
Tower crane, swing radius covers all six lots from central pad. Pin at module 03 north edge.
28M RADIUS
TRUCK ACCESS
IN at SE corner from Elmwood Ave eastbound. OUT at NE corner returning to Mack Ave.
2 LANES
RECEIVING POINT
RX pin at SW corner. Module deliveries staged 04:00 to 06:00, daily.
2 PER DAY
PEDESTRIAN ROUTE
School route flagged on east side. Coordinate fencing with City of Detroit DPW.
COORDINATE
PHASING
Three-phase build: lots 01-02, then 03-04, then 05-06. 30-day overlap on phase changes.
3 PHASES
UTILITY CUTS
Two cuts: one for water service at SW, one for electrical at NE. DTE coordination underway.
2 CUTS
TRAFFIC PLAN
Elmwood reduced to one lane during module deliveries. Police escort required for crane mob.
1 LANE
!
Pedestrian access conflict on east side.SCHOOL ROUTE CROSSES PROPOSED RECEIVING PIN · COORDINATE WITH CITY FOR FENCING
› COORDINATE
YOUR LOGISTICS WORKSPACE 0 decisions logged
INDEX  ·  DETROIT, GREAT LAKES REGION  ·  16 COMMODITIES  ·  LIVE
ESCALATION FEED · YEAR OVER YEAR · SOURCED ATTRIBUTION
Cite your escalation.
Every data point traces to a publisher and a date.
Steel
+4.2%
BLS PPI
Copper
+3.1%
COMEX
Electrical
+2.4%
NEMA
Labor
+1.8%
BLS CES
Concrete
+1.2%
PCA
Fuel
+0.6%
EIA
Glass
+0.2%
IGMA
Lumber
-2.1%
RANDOM LENGTHS
COMMODITY NOTES · WHY EACH IS MOVING
Steel
+4.2% YOY
Q1 mill consolidation reduced US capacity by 6%. Section 232 tariff schedule may extend through 2026.SOURCE: BLS PPI · UPDATED 14:23 EDT · APPLIED TO 8 PACKAGES
Copper
+3.1% YOY
Electrical demand from data center and EV growth pressuring supply. Detroit market reflects national trend.SOURCE: COMEX · UPDATED 14:23 EDT · APPLIED TO 4 PACKAGES
Electrical
+2.4% YOY
Switchgear and panelboard lead times stretching. NEMA report shows 22 week average across major manufacturers.SOURCE: NEMA · UPDATED 14:23 EDT · APPLIED TO 12 PACKAGES
Labor
+1.8% YOY
Detroit Building Trades CBA cycle landed 3.5% over 3 years. Local market reflects 1.8% YOY as blended rate.SOURCE: BLS CES · UPDATED 14:23 EDT · APPLIED TO ALL TRADES
Concrete
+1.2% YOY
Ready mix supply stable in Detroit metro. Cement clinker imports offset by domestic capacity additions.SOURCE: PCA · UPDATED 14:23 EDT · APPLIED TO 6 PACKAGES
Fuel
+0.6% YOY
Diesel prices stable through Q1 2026. Mobilization and equipment fuel surcharges minimal at current trend.SOURCE: EIA · UPDATED 14:23 EDT · APPLIED TO EQUIPMENT
Glass
+0.2% YOY
Insulated glazing supply stable. Three vendors quoting, no tariff exposure on US fabricators.SOURCE: IGMA · UPDATED 14:23 EDT · APPLIED TO 2 PACKAGES
Lumber
-2.1% YOY
Random Lengths shows softwood pricing down 2.1% YOY. Demand softening in residential housing starts.SOURCE: RANDOM LENGTHS · UPDATED 14:23 EDT · CREDIT TO 3 PACKAGES
!
Steel is the largest mover at +4.2% year over year.SOURCE BLS PPI · UPDATED 14:23 EDT · APPLY TO STEEL PACKAGE ESTIMATE
› LARGEST MOVER
YOUR COMMODITY WATCHLIST 0 commodities tracked
ACTIVITY LOG·ACROSS ALL FIVE TOOLS·LAST 7 DAYS
History.
Every action across Procure, Compass, Register, Stage, and Index.
Site plan updated for Cedar RidgeCRANE SWING RADIUS ADJUSTED FROM 26M TO 28M
STAGE    14:23 EDT
Steel escalation refreshedBLS PPI WEEKLY · +4.2% YOY · APPLIED TO PROCURE
INDEX    13:51 EDT
Tariff flag added on switchgearEATON ELECTRICAL · SECTION 232 NOTE ATTACHED
PROCURE    11:08 EDT
Site access risk escalated to HIGHPROBABILITY MOVED FROM POSSIBLE TO LIKELY · OWNER NOTIFIED
REGISTER    09:45 EDT
Lakefront Performance Center scored 78 / GO6 CRITERIA · MARGIN 82 · FIT 71 · RISK 62
COMPASS    YESTERDAY
Riverside Medical questionnaire resumedSAFETY CATEGORY COMPLETE · 14 OF 50 ANSWERED
VITALS    YESTERDAY
Elevator package marked CRITICALKONE SINGLE SOURCE · 28 WEEK LEAD · ORDER BY APR 14
PROCURE    2 DAYS AGO
Action triggered.