ORIGIN PRECON

Sign in to open the demo.

Two apps. One discipline. Preconstruction evolved.

Please enter a valid work email.
I have read and agree to the Terms of Use.

By continuing, you accept that this site logs your email and access time. The demo is for evaluation only.

© 2026 Origin Precon. All rights reserved.
Origin Precon Terms of Use v1.0 · May 2026
01
About
Origin Precon is a USPTO registered, independent software venture by Kevin Murdock. The demo at vitals.originprecon.com and precon.originprecon.com is provided for evaluation only and is not a substitute for professional preconstruction services.
02
License
You are granted a limited, non exclusive, non transferable, revocable license to access and view the demo for personal evaluation. No production use, redistribution, or commercial deployment is permitted without written agreement from Origin Precon.
03
Prohibited Uses
You may not (a) copy or republish any part of the site or its underlying code, (b) attempt to reverse engineer, decompile, or otherwise derive source code, (c) use the demo content to train or fine tune any machine learning model, (d) misrepresent your affiliation with Origin Precon or its owner, or (e) use the demo for any unlawful purpose.
04
Intellectual Property
All visual design, code structure, content, taglines, and trade dress are property of Kevin Murdock. ORIGIN PRECON, VITALS, TOOLS, PROCURE, COMPASS, REGISTER, STAGE, INDEX, and the associated marks are trademarks of Kevin Murdock. Unauthorized reproduction, redistribution, or reverse engineering is prohibited.
05
Third Party Content
The demo may reference public commodity indices including BLS PPI, Turner BCI, Mortenson CCI, Gordian, and RLB QCR. All such references are made under fair use with attribution. No endorsement is claimed or implied by the referenced publishers.
06
No Warranty
The demo is provided as is, without any warranty of any kind, express or implied. Origin Precon makes no representations about availability, accuracy, completeness, or fitness for any particular purpose. Project data shown in the demo is illustrative and does not reflect any real client engagement.
07
Limitation of Liability
In no event shall Kevin Murdock or Origin Precon be liable for any indirect, incidental, consequential, or punitive damages arising from your use of the demo. Total aggregate liability shall not exceed the amount you paid to access the demo, which is zero.
08
Confidentiality
You agree to treat the demo design, structure, and content as confidential. Do not share screenshots, URLs, or other materials publicly without written permission from Origin Precon.
09
Termination
Access may be revoked at any time, with or without notice. Upon termination, your license to use the demo ends immediately and you must cease all use of the materials.
10
Governing Law
These Terms are governed by the laws of the State of Michigan, without regard to conflict of law principles. Any dispute shall be resolved in the state or federal courts located in Wayne County, Michigan.
11
Contact
Questions about these Terms or about Origin Precon should be directed to info@originprecon.com.
© 2026 ORIGIN PRECON™ info@originprecon.com
ORIGIN PRECON
v1.0

Vitals

Project health diagnostics.
5 ACTIVE · 12 COMPLETE · 9 CATEGORIES · DETROIT, MICHIGAN PORTFOLIO HEALTH · 82%
ACTIVE SCANS·5 OF 17·LAST UPDATED 14:23 EDT
Active scans.
Resume diagnostics in progress, or open a completed report.
01
Riverside Medical Center, 6 story ambulatory tower. ANN ARBOR, MI  ·  $48.2M GMP  ·  18 MONTHS  ·  FEB 2026 → AUG 2027
› IN PROGRESS
DEEP SCAN
(?) 14 / 50 ANSWERED  ·  SAFETY · QUALITY COMPLETE  ·  LAST EDIT 2 DAYS AGO
+ ADD NOTE
02
Cedar Ridge Modular Block, 20 lot residential. DETROIT, MI  ·  $4.8M GMP  ·  14 MONTHS  ·  PURSUIT 26-0042
› 87 HEALTH
QUICK SCAN
(?) 20 / 20 COMPLETE  ·  3 ACTION ITEMS OPEN  ·  SIGNED OFF 5 DAYS AGO
+ ADD NOTE
03
Lakefront Performance Center, JV practice facility. DETROIT, MI  ·  $39M GMP  ·  24 MONTHS  ·  RFP RESPONSE
› IN PROGRESS
DEEP SCAN
(?) 8 / 50 ANSWERED  ·  SAFETY UNDERWAY  ·  STARTED YESTERDAY
+ ADD NOTE
04
Anchor Retail Refresh, flagship debranding. ANN ARBOR, MI  ·  4,500 SF  ·  8 WEEKS  ·  STORE #230
› 91 HEALTH
QUICK SCAN
(?) 20 / 20 COMPLETE  ·  1 ACTION ITEM OPEN  ·  SIGNED OFF 11 DAYS AGO
+ ADD NOTE
05
North Loop Bandshell, community pavilion. SHELBY TWP, MI  ·  22,021 SF  ·  16 MONTHS  ·  NO BID DECISION
› ARCHIVED
QUICK SCAN
(?) 0 / 20 ANSWERED  ·  NO BID RATIONALE LOGGED  ·  CLOSED 18 DAYS AGO
+ ADD NOTE
VITALS · HOME · PAGE 1 OF 1
ALL PROJECTS·17 TOTAL·FILTERS APPLIED
Projects.
Filter and review every project you have scanned.
FILTERS
01
Riverside Medical Center, 6 story ambulatory tower. ANN ARBOR, MI  ·  $48.2M GMP  ·  18 MONTHS  ·  FEB 2026 → AUG 2027
› IN PROGRESS
DEEP SCAN
(?) 14 / 50 ANSWERED  ·  SAFETY · QUALITY COMPLETE  ·  LAST EDIT 2 DAYS AGO
+ ADD NOTE
02
Cedar Ridge Modular Block, 20 lot residential. DETROIT, MI  ·  $4.8M GMP  ·  14 MONTHS  ·  PURSUIT 26-0042
› 87 HEALTH
QUICK SCAN
(?) 20 / 20 COMPLETE  ·  3 ACTION ITEMS OPEN  ·  SIGNED OFF 5 DAYS AGO
+ ADD NOTE
03
Lakefront Performance Center, JV practice facility. DETROIT, MI  ·  $39M GMP  ·  24 MONTHS  ·  RFP RESPONSE
› IN PROGRESS
DEEP SCAN
(?) 8 / 50 ANSWERED  ·  SAFETY UNDERWAY  ·  STARTED YESTERDAY
+ ADD NOTE
04
Anchor Retail Refresh, flagship debranding. ANN ARBOR, MI  ·  4,500 SF  ·  8 WEEKS  ·  STORE #230
› 91 HEALTH
QUICK SCAN
(?) 20 / 20 COMPLETE  ·  1 ACTION ITEM OPEN  ·  SIGNED OFF 11 DAYS AGO
+ ADD NOTE
05
North Loop Bandshell, community pavilion. SHELBY TWP, MI  ·  22,021 SF  ·  16 MONTHS  ·  NO BID DECISION
› ARCHIVED
QUICK SCAN
(?) 0 / 20 ANSWERED  ·  NO BID RATIONALE LOGGED  ·  CLOSED 18 DAYS AGO
+ ADD NOTE
COMPLETED REPORTS·12 TOTAL·SORTED BY RECENT
Reports.
Every completed scan, scored and exportable.
SORT BY
Cedar Ridge Modular BlockDEEP SCAN · DETROIT, MI · 50 / 50 ANSWERED
› 87 HEALTH    5 DAYS AGO
Anchor Retail RefreshQUICK SCAN · ANN ARBOR, MI · 20 / 20 ANSWERED
› 91 HEALTH    11 DAYS AGO
Forbes Sports MedicineDEEP SCAN · ANN ARBOR, MI · 50 / 50 ANSWERED
› 73 HEALTH    21 DAYS AGO
Hondros College NursingQUICK SCAN · LIVONIA, MI · 20 / 20 ANSWERED
› 79 HEALTH    32 DAYS AGO
Coleman A. Young Master PlanDEEP SCAN · DETROIT, MI · 50 / 50 ANSWERED
› 64 HEALTH    47 DAYS AGO
Apple Briarwood DebrandQUICK SCAN · ANN ARBOR, MI · 20 / 20 ANSWERED
› 94 HEALTH    58 DAYS AGO
SCAN TEMPLATES·2 BUILT IN·3 CUSTOM
Library.
Pick a template to start a scan, or build your own.
Quick Scan template20 questions across 9 categories · 15 minute completion · standard weighting
BUILT IN
Deep Scan template50 questions across 9 categories · 40 minute completion · adjustable weighting
BUILT IN
Hospital Deep ScanCustom · 60 questions with infection control and life safety modules · adjusted weights
CUSTOM
Modular Block Quick ScanCustom · 25 questions tuned for residential modular pursuits
CUSTOM
Pursuit-only ScanCustom · 12 questions for pre-design pursuit evaluation
CUSTOM
ACCOUNT·PREFERENCES·DATA
Settings.
Manage your account, notifications, and data.
AccountEMAIL · LAST LOGIN · ROLE
PROFILE
Plan and billingEARLY ACCESS · NO COST DURING BETA · USAGE METERED FOR PRODUCT FEEDBACK ONLY
BETA
NotificationsSCAN COMPLETE · ACTION ITEM OPENED · WEEKLY DIGEST
3 ENABLED
Data exportDOWNLOAD ALL SCANS, REPORTS, AND NOTES AS CSV OR JSON
EXPORT
Terms and brandUSPTO REGISTERED · ORIGIN PRECON™ · v1.0
REVIEW
RIVERSIDE MEDICAL CENTER  ·  DEEP SCAN  ·  14 / 50  ·  28%
CATEGORY 1 OF 9 · 2 ANSWERED · KEY FOR CONSTRUCTION
Safety.
Plan, empower, observe.
01
Is a Plan of the Day (POD) being conducted daily by project leadership, including stretch and flex?
×3
(?) WHY THIS MATTERS · KEY FOR CONSTRUCTION
02
Does the workforce feel empowered to stop unsafe work, with data showing this happens and is supported?
×3
(?) WHY THIS MATTERS · STOP WORK AUTHORITY
03
Are subcontractor safety plans aligned with the project specific safety program and reviewed before mobilization?
×2
(?) WHY THIS MATTERS · PREMOB COMPLIANCE
SAFETY  ·  QUESTION 3 OF 6
CEDAR RIDGE MODULAR BLOCK  ·  QUICK SCAN  ·  SIGNED OFF 5 DAYS AGO
DIAGNOSIS REPORT · WEIGHTED ACROSS 9 CATEGORIES · 50 / 50 ANSWERED
Cedar Ridge, weighted health.
Twenty answers, nine categories, one score.
82
PORTFOLIO HEALTH
DEEP SCAN · 50 OF 50 · SIGNED 14:23
POSITION: WATCH
CATEGORY BREAKDOWN
Safety
94
Quality
88
Cost Control
72
Schedule
85
Legal & Risk
68
Procurement
54
Design Coord
91
Owner Alignment
79
Team Readiness
88
!
3 action items open across Procurement and Legal & Risk.PROCUREMENT 2  ·  LEGAL & RISK 1  ·  ALL ASSIGNED  ·  DUE THIS WEEK
› 3 OPEN

Tools

Preconstruction utilities.
5 TOOLS · 14 WORKSPACES · 3 PINNED · OFFLINE READY SHARED WITH VITALS · PROJECT AWARE
FIVE TOOLS·BUILD A PRECON STACK·INDEPENDENT MODULES
Open a tool.
Each one solves a single precon problem cleanly.
01
Procure. Long lead time tracking and submittal cadence. 12 PACKAGES TRACKED  ·  2 CRITICAL  ·  LAST: CEDAR RIDGE 20 LOT
› 2 CRITICAL
LEAD TIMES
(?) ELEVATORS 28W  ·  SWITCHGEAR 23W  ·  STEEL 18W
+ PIN TO HUB
02
Compass. Go and no go scoring for pursuits. 3 PURSUITS ACTIVE  ·  LAST SCORE: 78 / GO  ·  6 CRITERIA
› 78 GO
PURSUIT FIT
(?) MARGIN 82  ·  FIT 71  ·  SCHEDULE 88  ·  RISK 62
+ PIN TO HUB
03
Register. Risk, assumption, and clarification ledger. 14 RISKS LOGGED  ·  3 HIGH  ·  9 MITIGATED  ·  17 RFIS ATTACHED
› 3 HIGH
RISK MATRIX
(?) 5 × 4 HEATMAP  ·  SCHEDULE, COST, SCOPE, QUALITY  ·  EXPORT TO PDF OR XLSX
+ PIN TO HUB
04
Stage. Site logistics, laydown, and crane planning. 2 SITE PLANS  ·  LAST: ELMWOOD AVE  ·  CRANE SWING 28M RADIUS
› ACTIVE
SITE PLAN
(?) 20 LOT MODULAR  ·  LAYDOWN AT SW CORNER  ·  IN, OUT, RECEIVING PINS PLACED
+ PIN TO HUB
05
Index. Market cost and escalation feed. REGIONAL FEED LIVE  ·  STEEL +4.2% YOY  ·  LUMBER −2.1%  ·  UPDATED HOURLY
› LIVE
ESCALATION
(?) 16 COMMODITIES TRACKED  ·  DETROIT, GREAT LAKES  ·  EXPORT TO ESTIMATE
+ PIN TO HUB
TOOLS · HUB · PAGE 1 OF 1
PROCURE  ·  CEDAR RIDGE MODULAR BLOCK  ·  12 PACKAGES  ·  2 CRITICAL
LEAD TIMES · SORTED BY WEEKS · MUST ORDER BY PROPAGATES TO SCHEDULE
Long leads.
Two critical packages threaten the schedule. Order steel by Apr 14.
ElevatorsKONE, single source quoted
28w
CRITICAL
SwitchgearEaton, lead time confirmed
23w
CRITICAL
SteelMill 14 weeks, fab 4 weeks
18w
WATCH
CurtainwallSpec change pending
16w
WATCH
GeneratorCaterpillar 1500 kW
14w
WATCH
GlazingInsulated units, three vendors
12w
OK
RTUsTrane, in production
11w
OK
Roofing membraneSika, stock available
6w
OK
!
Tariff exposure flagged on switchgear and steel.SECTION 232 STEEL TARIFF · EATON ELECTRICAL TARIFF · LAST UPDATED 14:23 EDT
› TARIFF
COMPASS  ·  LAKEFRONT PERFORMANCE CENTER  ·  PURSUIT 26-0042
PURSUIT SCORE · 6 CRITERIA WEIGHTED · THRESHOLD 70 / GO
Go.
Score 78 over threshold 70. Pursue, with risk mitigation in mind.
WEIGHTED CRITERIA
Margin
82
Fit
71
Schedule
88
Risk
62
Owner alignment
75
Team readiness
80
78
GO
THRESHOLD 70 · PASS BY 8
!
Risk score is the weakest factor at 62.SUGGESTED ACTION: ATTACH A REGISTER WORKSPACE TO MITIGATE BEFORE PROPOSAL SUBMITTAL
› ATTEND
REGISTER  ·  CEDAR RIDGE MODULAR BLOCK  ·  14 RISKS  ·  3 HIGH
RISK MATRIX · 5 × 4 HEATMAP · PROBABILITY × IMPACT
14 risks. 3 high.
Three risks cluster in the high probability, high impact corner. Contingency band $180k to $260k.
VERY HIGH
HIGH
MEDIUM
LOW
LOW UNLIKELY POSSIBLE LIKELY CERTAIN
PROBABILITY
!
Top 3 risks open against schedule and procurement.SITE ACCESS DELAY · STEEL TARIFF UPWARD REVISION · OWNER SIGN OFF ON MODULAR FINISH
› 3 HIGH
STAGE  ·  CEDAR RIDGE MODULAR BLOCK  ·  ELMWOOD AVE  ·  CRANE 28M
SITE PLAN · 20 LOT MODULAR LAYOUT · LAYDOWN AT SW CORNER
Site logistics.
Laydown sized for two module deliveries per day. Crane swing covers all six lot edges.
LAYDOWN
2 mod / day
SW corner
240 sf
ELMWOOD AVENUE
LOTS LAYDOWN CRANE SWING UTILITIES PEDESTRIAN
!
Pedestrian access conflict on east side.SCHOOL ROUTE CROSSES PROPOSED RECEIVING PIN · COORDINATE WITH CITY FOR FENCING
› COORDINATE
INDEX  ·  DETROIT, GREAT LAKES REGION  ·  16 COMMODITIES  ·  LIVE
ESCALATION FEED · YEAR OVER YEAR · SOURCED ATTRIBUTION
Cite your escalation.
Every data point traces to a publisher and a date.
Steel
+4.2%
BLS PPI
Copper
+3.1%
COMEX
Electrical
+2.4%
NEMA
Labor
+1.8%
BLS CES
Concrete
+1.2%
PCA
Fuel
+0.6%
EIA
Glass
+0.2%
IGMA
Lumber
-2.1%
RANDOM LENGTHS
!
Steel is the largest mover at +4.2% year over year.SOURCE BLS PPI · UPDATED 14:23 EDT · APPLY TO STEEL PACKAGE ESTIMATE
› LARGEST MOVER
ACTIVITY LOG·ACROSS ALL FIVE TOOLS·LAST 7 DAYS
History.
Every action across Procure, Compass, Register, Stage, and Index.
Site plan updated for Cedar RidgeCRANE SWING RADIUS ADJUSTED FROM 26M TO 28M
STAGE    14:23 EDT
Steel escalation refreshedBLS PPI WEEKLY · +4.2% YOY · APPLIED TO PROCURE
INDEX    13:51 EDT
Tariff flag added on switchgearEATON ELECTRICAL · SECTION 232 NOTE ATTACHED
PROCURE    11:08 EDT
Site access risk escalated to HIGHPROBABILITY MOVED FROM POSSIBLE TO LIKELY · OWNER NOTIFIED
REGISTER    09:45 EDT
Lakefront Performance Center scored 78 / GO6 CRITERIA · MARGIN 82 · FIT 71 · RISK 62
COMPASS    YESTERDAY
Riverside Medical questionnaire resumedSAFETY CATEGORY COMPLETE · 14 OF 50 ANSWERED
VITALS    YESTERDAY
Elevator package marked CRITICALKONE SINGLE SOURCE · 28 WEEK LEAD · ORDER BY APR 14
PROCURE    2 DAYS AGO
Action triggered.